Friday, January 12, 2018
MTA construction costs, analyzed
For years, those watching the MTA have rung the alarm on the agency’s high construction costs. I’ve written about cost concerns and the ever-increasing budgets for big-ticket MTA capital projects for years, and I’m not alone. Alon Levy has, since this post in 2011, charted the absurd costs of U.S. rail construction in detailed comparisons with international peers, and Stephen Smith, via the @MarketUrbanism twitter feed, has beaten the cost drum. When challenged, MTA officials have acknowledged that construction costs, but no one has tackled the twin issues of cost transparency and cost control. No one, that is, until last week, when The Times ran a massive front-page story charting all the reasons why NYC transit construction are so high.Unsurprisingly, it's not because NYC is special, but because NYC is especially corrupt.
Labels: local, politics, trends